# Calculate takt time and the stations you need

> Enter your shifts and demand: see takt time and whether each station can keep up.

Calculate takt time from shifts, breaks and demand, then compare station cycle times. See the bottleneck, minimum stations, balance efficiency and capacity.

- Tool: [Takt time calculator](https://fixmint.cc/takt-time-calculator)
- Category: [Industrial & networks](https://fixmint.cc/industrial)
- Fixes: Can the line meet demand?
- Runs in the browser: files and text stay on the device, no sign-up, free.

## How to calculate takt time

1. Enter the shift length, number of shifts, breaks and planned stops, and the units your customer needs per day.
2. Read takt time in seconds and minutes, the output needed per hour and the available production minutes.
3. List each station and its cycle time in seconds to see the bottleneck, the minimum stations and which stations exceed takt.

## Questions

### What is takt time?

Takt time is the pace at which a line must make a unit to meet customer demand: available production time divided by demand. Available time is shifts × (shift length − breaks − planned stops). It is a requirement set by demand, not a measurement of how fast the line actually runs.

### How is it different from cycle time?

Takt time is how often a unit must come off the line; cycle time is how long a station actually takes. If a station’s cycle time is longer than takt, that station cannot meet demand even running perfectly. Line balancing spreads work so every station fits under takt.

### How are the station figures worked out?

The bottleneck is the station with the longest cycle time. The minimum number of stations is the sum of all cycle times divided by takt, rounded up. Balance efficiency is the sum of cycle times divided by (number of stations × bottleneck cycle time). The most units the line can make per day is the available seconds divided by the bottleneck cycle time, before losses beyond those you entered.

### Does this include OEE or unplanned downtime?

No. Only the breaks and planned stops you enter are removed; unplanned stoppages, scrap and changeovers are not modelled. A line whose bottleneck sits at takt with no allowance has no slack for those losses, so real targets usually leave some margin.

## Related tools

- [OEE calculator](https://fixmint.cc/oee-calculator): What is the line really achieving?
- [Analog signal scaling](https://fixmint.cc/analog-signal-scaling): What does 12 mA mean?
- [Voltage drop calculator](https://fixmint.cc/voltage-drop-calculator): Is this cable too thin?